Capo
Regional Manufacturing Hub NetworkWaterfall with phase gates
DE
Approval points

Gates

0 of 3 passed.

Phase 1
Phase 1: Establish Chicago and Akron
Not yet reviewed
Planned2026-12-31
ActualOpen
Work open6 of 9
Exit criteria
  • Both leases executed
  • Chicago assembly line 1 commissioned and producing first articles
  • Akron finishing cell qualified against the first article standard
  • 34 roles hired and trained
  • A cost model validated from actual production rather than estimates
Phase 2
Phase 2: Certify and scale
Not yet reviewed
Planned2027-07-01
ActualOpen
Work open5 of 5
Exit criteria
  • ISO 9001 certification granted at Chicago
  • 70 percent of units produced on company-operated lines for two consecutive months
  • Landed unit cost at or below 6.40 dollars
  • The Tulsa business case re-approved against Phase 1 and Phase 2 actuals
Phase 3
Phase 3: Establish Tulsa
Not yet reviewed
Planned2028-03-02
ActualOpen
Work open4 of 4
Exit criteria

None recorded. Nobody can fail this gate, which means it will not hold.

How to read this
Passed, conditional, not passed, not yet reviewed
The decision taken at the approval point. Passed with conditions means the work moved on with something still owed, and it is shown as its own state rather than folded into passed.
Exit criteria
What has to be true before the approval point can be passed. An approval point with none recorded is a date rather than a decision, and the interface says so.
Planned and actual
The date the approval point was planned for, and the date it actually closed. Open means it has not closed yet.
Work open
Items still unfinished against the total in this stage. Open work at an approval point is what the conditions usually attach to.