Regional Manufacturing Hub NetworkWaterfall with phase gates
DE
Register

Risks

7 open, ranked by exposure.

1 overdue for review
Open risks with probability, impact, exposure and response.
RiskProbabilityImpactExposureResponseReview
Equipment lead times run 22 to 30 weeksA long lead item slipping moves Chicago commissioning and the Phase 1 gate with it.
4416Mitigate13 days late
Hiring 34 people in two markets at onceA shortfall in either city delays qualification of both hubs, because each depends on the other.
4312Mitigate2026-09-10
Working capital for raw material inventoryHub production requires 1921 to carry inventory the contract manufacturers used to carry.
3412Transfer2026-09-24
Single retail partner carries most committed volumeA change in their order pattern changes the entire capacity case.
2510Accept2026-10-08
Transition gap during a retail seasonMoving volume off an incumbent before the receiving hub is qualified risks a supply gap.
2510Avoid2026-11-05
Certification and scale compete for the same quality staffThe people carrying the ISO 9001 audit are the people qualifying the second line.
339Not decidedNot scheduled
Oklahoma incentive package is not yet awardedThe Phase 3 case is materially better with it, and building the budget on it would be a guess.
339Accept2026-10-22
How to read this
Probability
How likely the risk is, scored 1 to 5. 1 is rare, 5 is near certain. Unscored risks say so rather than defaulting to a middle value.
Impact
How much damage it would do if it happened, scored 1 to 5 on the same scale.
Exposure
Probability multiplied by impact, so the range is 1 to 25. The register is ranked by it, and 15 and above is printed in rust because that is the line where a risk earns a conversation.
Response
The chosen strategy: avoid, transfer, mitigate, accept, or escalate. Not decided is shown as itself rather than as an empty cell.
Review
The date this risk is next due to be re-examined. Past that date it reads as days late, because an unreviewed register goes stale quietly.